Product Details

Technical Parameters

Bottom material

3mm steel plate/GRP

Flooring Finish

Tile/Stone

Wall material

30/50mm composite rockwool panel

Wall Finish

PVC/PET/Tile

Ceiling material

30mm composite  rockwool  panel

Ceiling Finish

PVC

Door Leaf  Finish

Powder painting/PVC

Dry Wet Separation

Curtain/Shower Screen

Hoisting and positioning

Hoisting

● According to the label instructions attached on unit,the unit shall be lifted and moved to the proper position while stability shall be maintained during the hoisting process.
● All the four rings on unit top must be hoisted.Three or fewer hooks to lift the unit may cause tipping over or decoupling hazards.
● After the unit is positioned,the rainproof cover on top of unit shall be removed in time to avoid fire accident during welding etc.

Positiong
● The bottom plate can be adjusted in case the ground is uneven.
● After adjusting the bathroom unit to the level,weld the anchor bolt to the deck.

Connection of pipe lines and electric cable

Connection of inlet and outlet pipe
cautious of inlet pipe connection

● Use valve to connect the inlet pipes,the material is SUS304.
● Before the whole ship piping system test,the inlet valves needed to be tuined off avoid instant huge pressure during this test which may break the pipe or damage the sanitary wares.
● Pipe testing pressure range:0.6Mpa~0.8Mpa.

Connection of outlet pipe

Connection of electric cable

The circuit diagram is for your reference,it can be adjusted according to the different demand.

 

Product Message

CONTACT

Add:Block B, 6th floor, No.3255 Zhoujiazui Road, Yangpu District, Shanghai, China

Tel: 86-21-65202845

Mobile:86-13661960816

Mail:sales@jiulingmarine.com.cn

 

INFORMATION

Sign up to receive our weekly newslertter

%{tishi_zhanwei}%

Page Copyright: Shanghai Jiuling Marine Co., Ltd.www.300.cn  SEO

Business License